Detailed design report
The detailed design report is prepared by the lead consultant for the client at the end of the detailed design stage, when the design is detailed but has yet to be packaged.
The detailed design report might include:
- A design and access statement.
- Site layout plans.
- Functional layouts.
- Circulation and operational strategy.
- Floor plans, sections and elevations.
- 3d modelling.
- Details of wall enclosures.
- Details of doors and windows.
- Details of key specification items such as door handles, plumbing fixtures and so on.
- Reflected ceiling plan.
- Key technical designs.
- Co-ordination between architectural and engineering design.
- Phasing, demolition and decanting strategies.
- The use of materials and the potential for re-use, recycling and waste handling (see site waste management plan).
- Structural design criteria.
- Drainage.
- Sustainability.
- Cleaning and maintenance strategy.
- Site services analysis (existing gas, water, electrical, mechanical, etc. services).
- Building services design criteria.
- Services strategy.
- Health and safety strategy.
- Fire strategy.
- Status of approvals.
- Risk assessment.
- Cost plan.
- Programme and phasing.
- Procurement strategy.
The report should highlighting any instructions required from the client.
It should only include required, or key co-ordinated information and necessary interpretation and should not duplicate information that already exists elsewhere.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.